logo
ProjectClosed

L4439 Box Culvert Replacement

One of 10,000+ projects Taiyo tracks in Minnesota.

Source: Dodge USA

The major items of work are approximately: 1 Each of Remove Pipe Culvert 36 Lin. Ft 12' X 5' Precast Concrete Box Culvert 2 Each of 12' X 5' Precast Concrete Box Culvert End Section 499 Cu. Yds. of Structure Excavation Class U

Status
Closed
Sector
Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial
Location
Greenbush, Minnesota, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about L4439 Box Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “L4439 Box Culvert Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Greenbush, Minnesota, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The major items of work are approximately: 1 Each of Remove Pipe Culvert 36 Lin. Ft 12' X 5' Precast Concrete Box Culvert 2 Each of 12' X 5' Precast Concrete Box Culvert End Section 499 Cu. Yds. of Structure Excavation Class U

Procurement method

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Greenbush

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial

Article published date

2024-04-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project