logo

La Castellana Wind Project

Sector: Road • Location: Argentina

Source: Inter-American Development Bank (IADB)

Project
In Implementation

The Castellana wind power project (the “Project” or “La Castellana”) will add 99 MW of renewable energy to the Argentinean electricity system, thus directly supporting the Government of Argentina’s (“GoA”) priorities to ensure a stable long-term electricity supply and the diversification of its energy matrix with the expected addition of 2.7 GW from renewables sources by 2018. The project consists

Project Information FAQ

Project Information

4 Q
The project “La Castellana Wind Project” is an infrastructure initiative in the Road sector, located in Argentina. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Castellana wind power project (the “Project” or “La Castellana”) will add 99 MW of renewable energy to the Argentinean electricity system, thus directly supporting the Government of Argentina’s (“GoA”) priorities to ensure a stable long-term electricity supply and the diversification of its energy matrix with the expected addition of 2.7 GW from renewables sources by 2018. The project consists of the construction, operation and maintenance of a 99 MW wind farm, its associated facilities, a 132kV 45km transmission line and 15km of service roads, to be located south of the province of Buenos Aires, 36km northwest of the city of Bahia Blanca, Argentina. The Project will sign a 20-year power purchase agreement (“PPA”) with the wholesale electric market administrator (“CAMMESA”) to inject energy to the national interconnection system (¨SADI¨) via the 132 kV Chañares substation, at a bidding price of US$61.50/MWh increased annually by an adjustment factor. Electrical studies were presented to the relevant authorities, which provided a favorable opinion to the Project´s interconnection specifications for the assigned node. The Borrower is expected to enter into an EPC contract covering civil and electromechanical works, and a turbine supply agreement for the turbines from a first-tier manufacturer and a long-term O&M contract. It has an estimated 18-month construction period, with construction starting by the first quarter of 2017. Wind resource has been assessed by DNV GL based on on-site wind measurements from October 2012 to March 2016, with average wind speeds of 8.6m/s at 81m hub height. The Project has a capacity factor of 50.6% and estimated annual energy production at P50 of 439.5GWh/year.Transaction Structure and Financing Highlights. The estimated total cost of the Project is of up to US$200 million, which will be financed through an IDB Group loan of up to US$50 million. The financial plan will be completed with the participation of a multilateral organization or export-credit agency as well as equity contributions for a 75/25 debt-to-equity ratio. The project will be required to meet the customary sizing criteria applied to wind projects, DSCR 1.30x for P9010-years and 1.00x for P991-year. The IDBG loan is expected to have a tenor of up to 15 years door-to-door. The project will have the security package customary for this type of project finance transactions.Development Impact. The Project will have positive developmental impacts, such as: (i) adding 99 MW of renewable capacity to the Argentinean grid, representing 15% of the total current NCRE installed capacity, thus decreasing thermal and hydro generation reliance and contributing to the 20% goal of NCRE by 2025; and (ii) displacing approximately 216,234 equivalent tons of carbon emissions per year. Financial additionality is strong as the tenor of the financing is 15 years door to door, a long tenor that is critical for the financial viability of this type of infrastructure projects, and which is simply not available in the local capital markets. Commercial banks have not structured project financing transactions in Argentina for the last 10 years and hence the participation of multilateral and bilateral agencies in this first round of the RenovAR program will be key to its success.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data