La Chira Waste Water Treatment Plant
Sector: Commercial • Location: Peru
Source: World Bank Group
The La Chira Waste Water Treatment plant was a a 25-year BOT contract to supply treated water to Lima. The concessionaire was to build the necessary infrastructure to provide the national drinking water and sewer system Servicio de Agua Potable y Alcantarillado (Sedapal) with treatment services of roughly 25% of the wastewater of the Peruvian capital, covering 2.5 million people. The plant was to
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about La Chira Waste Water Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The La Chira Waste Water Treatment plant was a a 25-year BOT contract to supply treated water to Lima. The concessionaire was to build the necessary infrastructure to provide the national drinking water and sewer system Servicio de Agua Potable y Alcantarillado (Sedapal) with treatment services of roughly 25% of the wastewater of the Peruvian capital, covering 2.5 million people. The plant was to have an average capacity of 6.3 cubic metres a second and a maximum level of 11.3 metres a second. This was to help Peru meet its Milenium Goals of 100% treated wastewater by 2015. In November 2010 ProInversion, Peru's federal investment promotion agency awarded a 25-year PPP concession to ACCIONA Agua and the Peruvian company Graña Montero. Grana y Montero and Acciona Agua were also the EPC contractors of the project. The winning consortium beat rival groups including ACS Servicios, Comunicaciones y Energía (Spain); Consorcio Odebrecht - Foz (Brazil) and Consorcio PTAR La Chira, comprising Andrade Gutiérrez (Brazil) and Abengoa (Peru). The total project cost was The PEN280m ($104.52m. Financing comprised PEN30m ($US11.2m) equity and PEN250m ($US93.32m) 23-year term loan arranged by BBVA. Loan agreement was signed on 2 Feb 2012. Delmar & Ugarte was the legal adviser to borrower. BBVA was the financial adviser to borrower. The plant was expected to be operational in March 2014. |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | Peru |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
