logo

La Chira Waste Water Treatment Plant

Sector: Water Supply and Storage • Location: Peru

Source: World Bank Group

Project
Active

The La Chira Waste Water Treatment plant was a a 25-year BOT contract to supply treated water to Lima. The concessionaire was to build the necessary infrastructure to provide the national drinking water and sewer system Servicio de Agua Potable y Alcantarillado (Sedapal) with treatment services of roughly 25% of the wastewater of the Peruvian capital, covering 2.5 million people. The plant was to

Project Information FAQ

Project Information

5 Q
The project “La Chira Waste Water Treatment Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The La Chira Waste Water Treatment plant was a a 25-year BOT contract to supply treated water to Lima. The concessionaire was to build the necessary infrastructure to provide the national drinking water and sewer system Servicio de Agua Potable y Alcantarillado (Sedapal) with treatment services of roughly 25% of the wastewater of the Peruvian capital, covering 2.5 million people. The plant was to have an average capacity of 6.3 cubic metres a second and a maximum level of 11.3 metres a second. This was to help Peru meet its Milenium Goals of 100% treated wastewater by 2015. In November 2010 ProInversion, Peru's federal investment promotion agency awarded a 25-year PPP concession to ACCIONA Agua and the Peruvian company Graña Montero. Grana y Montero and Acciona Agua were also the EPC contractors of the project. The winning consortium beat rival groups including ACS Servicios, Comunicaciones y Energía (Spain); Consorcio Odebrecht - Foz (Brazil) and Consorcio PTAR La Chira, comprising Andrade Gutiérrez (Brazil) and Abengoa (Peru). The total project cost was The PEN280m ($104.52m. Financing comprised PEN30m ($US11.2m) equity and PEN250m ($US93.32m) 23-year term loan arranged by BBVA. Loan agreement was signed on 2 Feb 2012. Delmar & Ugarte was the legal adviser to borrower. BBVA was the financial adviser to borrower. The plant was expected to be operational in March 2014.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data