logo

La Esperanza Hydro Project

Sector: Power Generation (CCGT) • Location: Honduras

Source: World Bank

Project
Closed

The development objective of the La Esperanza Hydroelectric Development Project for Honduras is to support a small, 12MW hydroelectric project in La Esperanza through purchasing greenhouse gas (GHG) emission reductions. There are two components to the project, the first component being delivery of carbon emission reductions as a by-product of electricity generation. La Esperanza is expected to pro

Project Information FAQ

Project Information

5 Q
The project “La Esperanza Hydro Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Honduras. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the La Esperanza Hydroelectric Development Project for Honduras is to support a small, 12MW hydroelectric project in La Esperanza through purchasing greenhouse gas (GHG) emission reductions. There are two components to the project, the first component being delivery of carbon emission reductions as a by-product of electricity generation. La Esperanza is expected to produce an annual average of 39,000 tCO2 Emission Reductions (ER). Community Development Carbon Fund (CDCF) will purchase a total of 310,000 tCO2 emission reductions at the price of US$4.50. The minimum annual delivery is set at 30,000 tCO2 a year but CDCF will purchase all annual ER production up to the cumulative 310,000 tCO2, expected to be reached by 2012 at the earliest. The total payment is US$1,395,000. This total does not include recovery of project preparation expenses such as those related to the baseline establishment, validation, monitoring, verification and certification. These will be deducted annually up to the cumulative maximum amount of US$125,000. Finally, the second component is the delivery of environmental and social community benefits. The payments for the emission reductions are directly linked to the sponsor's meeting the conditions set in the community development plan. These include: a) full-time employment of at least 70 permanent residents of la Esperanza and surrounding communities during the construction phase; and b) full-time employment of at least 20 permanent residents of La Esperanza and surrounding communities during plant operation (through December 31, 2012).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data