La Genoveva
Sector: Raw Materials • Location: Argentina
Source: International Finance Corporation (IFC)
La Genoveva wind farm (the “Project”) is the third project awarded to Central Puerto S.A. (“CP” or the “Sponsor”) in the RenovAr auctions (“RenovAr” or the “Program”). The project will be located 30km northwest of the city of Bahia Blanca in Buenos Aires province. This is the third IFC investment on wind farms in Argentina with Central Puerto, and the first two investments were Achiras (Cordo
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | La Genoveva wind farm (the “Project”) is the third project awarded to Central Puerto S.A. (“CP” or the “Sponsor”) in the RenovAr auctions (“RenovAr” or the “Program”). The project will be located 30km northwest of the city of Bahia Blanca in Buenos Aires province. This is the third IFC investment on wind farms in Argentina with Central Puerto, and the first two investments were Achiras (Cordoba province) and La Castellana, also in Buenos Aires province. IFC will be financing first phase of La Genoveva wind farm complex, which will be split in two sub projects called La Genoveva I and II. Combined total power generation capacity of both projects will be 130 MW, and , 88,2 MW each phase, and both projects expect to export 532.198 MWh/year to the national grid (362.234 MWh/year each phase). Total area of La Genoveva wind farm is 3008 ha, whilst La Genoveva I will use 1410 ha, which is mainly covered with open grass land with small fragments of shrub woodland. The land has been retained under long term lease contract with private owners (local farmers), which can still use the surrounding area for cattle ranching. Each development phase (La Genoveva I and II) will use 21 Vestas wind turbine generators with 4,2 MW capacity each. Wind turbines are supported by 130-meter tubular towers and run by three blades with total 132- meter diameter. All electrical cables connecting the towers to the substation will be buried. The energy generated by all wind turbo generators (WTG) will be stepped up from 33KV to the transmission voltage of 132KV at the substation, which will be located 50m away from an existing transmission line connected to the national grid. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
