La Habra Heights - Zone 3 and Zone 5 Street Improvements
Sector: Water Supply and Storage • Location: La Habra Heights, California, United States of America
Source: Dodge
The project to be constructed consists of grinding of existing asphalt pavement, removal of existing pavement and construct AC Dig-Out, construct AC Berm, adjusting to grade existing utility valves and manholes, and installation of thermoplastic pavement markings and striping. The project is located on Tumin Road, Fullerton Road, East Road, Skyline Drive, Kanola Road, Dorothea Road, Avocado Crest
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Consumer Products, Government
- Location
- La Habra Heights, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about La Habra Heights - Zone 3 and Zone 5 Street Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project to be constructed consists of grinding of existing asphalt pavement, removal of existing pavement and construct AC Dig-Out, construct AC Berm, adjusting to grade existing utility valves and manholes, and installation of thermoplastic pavement markings and striping. The project is located on Tumin Road, Fullerton Road, East Road, Skyline Drive, Kanola Road, Dorothea Road, Avocado Crest Road, Oleander Road, Peppertree Drive and Encinas Drive in La Habra Heights. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | La Habra Heights |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Consumer Products, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
