logo
ProjectCompleted

La Higuera

One of 3,492 projects Taiyo tracks in Chile.

Source: International Finance Corporation (IFC)

Hidroelectrica La Higuera (HLH or the project) is a 50:50 joint venture formed in May 2004 by Pacific Hydro Limited (PHL) and Statkraft Norfund Power Invest AS (SNPI), collectively, the sponsors.HLH will build, own and operate a 155 MW run-of-the-river hydro power plant located in the Tinguiririca Valley east of the city of San Fernando. The project diverts the Tinguiririca River and its major tri

Status
Closed
Sector
Bridge, Tunnel, Wind, Road, Water Supply and Storage, Hydro, Geothermal, Government, Power Generation (CCGT)
Location
Chile
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about La Higuera

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “La Higuera” is an infrastructure initiative in the Bridge sector, located in Chile. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Hidroelectrica La Higuera (HLH or the project) is a 50:50 joint venture formed in May 2004 by Pacific Hydro Limited (PHL) and Statkraft Norfund Power Invest AS (SNPI), collectively, the sponsors.HLH will build, own and operate a 155 MW run-of-the-river hydro power plant located in the Tinguiririca Valley east of the city of San Fernando. The project diverts the Tinguiririca River and its major tributary Azufre just upstream of their confluence. At a gross head of 367 meters and a design flow of 50 m3/s, the installed capacity is 155 MW in two generating units equipped with vertical Francis turbines in a surface powerhouse. Firm capacity is estimated at 128 MW and average annual energy production at about 840 GWh. A 38 km long transmission line will be built to connect with Chile’s central grid at San Fernando.

Original sector

BA - Large Hydro - Renewable Energy Generation

Location

Country

Chile

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Bridge, Tunnel, Wind, Road, Water Supply and Storage, Hydro, Geothermal, Government, Power Generation (CCGT)

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project