La Jacinta Solar Power Project
Sector: Power Generation (CCGT) • Location: Uruguay
Source: Inter-American Development Bank (IADB)
The objective of the project is to increase by 65MWp the installed capacity of non-traditional renewable energy in Uruguay thus directly supporting Government¿s priorities to ensure a stable and diversified long-term electricity supply regardless of hydrologic conditions and to increase energy generation from clean sources.
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar, Government
- Location
- Uruguay
- Updated
- 22 Jul 2026
- Source
- Inter-American Development Bank (IADB)
ConstructChat
Ask ConstructChat about La Jacinta Solar Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the project is to increase by 65MWp the installed capacity of non-traditional renewable energy in Uruguay thus directly supporting Government¿s priorities to ensure a stable and diversified long-term electricity supply regardless of hydrologic conditions and to increase energy generation from clean sources. |
Original sector | ENERGY |
Budget |
Location
Country | Uruguay |
Source
Source | Inter-American Development Bank (IADB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Government |
Article published date | 2025-06-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
