La Jacinta Solar Power Project
Sector: Solar • Location: Uruguay
Source: Inter-American Development Bank (IADB)
Effective January 1, 2016, this operation is being managed by the Inter-American Investment Corporation (IIC). For information disclosed by the Inter-American Development Bank (IDB) before that date, please refer to theProjects section on the IDB website.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT)
- Location
- Uruguay
- Updated
- 22 Jul 2026
- Source
- Inter-American Development Bank (IADB)
ConstructChat
Ask ConstructChat about La Jacinta Solar Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | repaid |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Effective January 1, 2016, this operation is being managed by the Inter-American Investment Corporation (IIC). For information disclosed by the Inter-American Development Bank (IDB) before that date, please refer to theProjects section on the IDB website. |
Original sector | Energy |
Budget |
Location
Country | Uruguay |
Source
Source | Inter-American Development Bank (IADB) |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-12-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
