La Joya Hydroelectric Plant
Sector: Water Supply and Storage • Location: Peru
Source: World Bank Group
La Joya was a 9.6 MW run-of-river plant in Arequipa region that was expected to displace 41,987t/y of CO2. As a result, the anticipated project was registered as Clean Development Mechanism in the UN Framework Convention on Climate Change (UNFCCC) in November 2008. The project took advantage of existing irrigation infrastructure in the Chili river district.
In April 2009, the project was award
- Status
- Prospective
- Sector
- Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about La Joya Hydroelectric Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | La Joya was a 9.6 MW run-of-river plant in Arequipa region that was expected to displace 41,987t/y of CO2. As a result, the anticipated project was registered as Clean Development Mechanism in the UN Framework Convention on Climate Change (UNFCCC) in November 2008. The project took advantage of existing irrigation infrastructure in the Chili river district. In April 2009, the project was awarded to Generadora de Energía del Perú (Gepsa)[Peru, 100%] under a license scheme and was given a definitive concession by Peru’s Ministry of Energy and Mines. By the time of the awarding, the works on the project were 98% complete. The investment figure was not available. Electricity output was to be sold to Peru’s national grid. In December 2009, the plant became operational and was nearly running at full capacity. July 2012: total investment ESTIMATED at 9.6MW x 3.2 million per MW (average for LAC), $30.7 million. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Peru |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
