logo

La Joya Hydroelectric Plant

Sector: Water Supply and Storage • Location: Peru

Source: World Bank Group

Project
Active

La Joya was a 9.6 MW run-of-river plant in Arequipa region that was expected to displace 41,987t/y of CO2. As a result, the anticipated project was registered as Clean Development Mechanism in the UN Framework Convention on Climate Change (UNFCCC) in November 2008. The project took advantage of existing irrigation infrastructure in the Chili river district.

In April 2009, the project was award

Status
Prospective
Sector
Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Commercial
Location
Peru
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about La Joya Hydroelectric Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “La Joya Hydroelectric Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

La Joya was a 9.6 MW run-of-river plant in Arequipa region that was expected to displace 41,987t/y of CO2. As a result, the anticipated project was registered as Clean Development Mechanism in the UN Framework Convention on Climate Change (UNFCCC) in November 2008. The project took advantage of existing irrigation infrastructure in the Chili river district. In April 2009, the project was awarded to Generadora de Energía del Perú (Gepsa)[Peru, 100%] under a license scheme and was given a definitive concession by Peru’s Ministry of Energy and Mines. By the time of the awarding, the works on the project were 98% complete. The investment figure was not available. Electricity output was to be sold to Peru’s national grid. In December 2009, the plant became operational and was nearly running at full capacity. July 2012: total investment ESTIMATED at 9.6MW x 3.2 million per MW (average for LAC), $30.7 million.

Original sector

Energy

Procurement method

Budget

Location

Country

Peru

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project