logo

La Piedad Bypass and Access to Mexico-Gudalajara Highway

Sector: Road • Location: Mexico

Source: World Bank Group

Project
Active

On November 18, 2009 the Mexican construction company ICA SA de CV, in a ceremony led by the Mexican President, officially began the construction, operation and maintenance of the 21.4km La Piedad bypass, as well as the widening and operation of a 38.8km section of federal highway Mex-110 and the rehabilitation of a 7.32km stretch of highway Mex-90, in the states of Guanajuato and Michoacan for a

Status
Prospective
Sector
Road, Bridge, Government, Commercial
Location
Mexico
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about La Piedad Bypass and Access to Mexico-Gudalajara Highway

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “La Piedad Bypass and Access to Mexico-Gudalajara Highway” is an infrastructure initiative in the Road sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On November 18, 2009 the Mexican construction company ICA SA de CV, in a ceremony led by the Mexican President, officially began the construction, operation and maintenance of the 21.4km La Piedad bypass, as well as the widening and operation of a 38.8km section of federal highway Mex-110 and the rehabilitation of a 7.32km stretch of highway Mex-90, in the states of Guanajuato and Michoacan for a period of 30 years. ICA formed Libramiento ICA La Piedad, SA de CV as the project company. Tolls were to be collected on the bypass. The Piedad bypass was to connect with the Irapuato – La Piedad Highway (project #3525) for which ICA holds a private service contract under the PPS model. The bypass was expected to create 4,800 construction related jobs while reducing noise and traffic congestion from traffic between the Bajio region and western Mexico. The project was awarded to ICA SA de CV by SCT on November 28, 2008. The award followed an international, competitive tender launched by SCT on October 30, 2007. The tender was launched under the new concession model in which the bidding criterion was the lowest amount of government subsidies. Three consortia submitted final bids: Controladora de Operaciones de Infraestructura, SA de CV (ICA), Rostec de Mexico, SA de CV and Isolux Corsan Concesiones, SA. The total project cost was estimated at 1896 million pesos (US $140.4 million). Banco Santander and Banorte loaned over 1000 MXN (US $74) million as 15-year bank debt priced at 275bp in the first quarter of 2009. The exact date that the banks arranged the debt facility was not known. The project was expected to become operational in the first quarter of 2011. By the end of the fourth quarter of 2012, the project became operational according to company reports. Converted using the IMF market rate period average for 2009 =13.5 MXN to 1 USD

Original sector

Transport

Procurement method

Budget

Location

Country

Mexico

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Bridge, Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project