La Unión port container terminal
One of 2,212 projects Taiyo tracks in El Salvador.
Source: InfraPPPWorld
The project includes several phases; however, the concession is for Phase I, which comprises an area of over 32 hectares, a berth of 560 meters, and another berth of 340 meters. It is able to be reached through a channel of 22 km. The concession does not include extra areas, the access channels, navigational aids and administrative buildings (all of these are to be operated by the State).
- Status
- Under Construction
- Sector
- Government
- Location
- El Salvador
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about La Unión port container terminal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | project in tender |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes several phases; however, the concession is for Phase I, which comprises an area of over 32 hectares, a berth of 560 meters, and another berth of 340 meters. It is able to be reached through a channel of 22 km. The concession does not include extra areas, the access channels, navigational aids and administrative buildings (all of these are to be operated by the State). |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | El Salvador |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project