La Venta III
Sector: Commercial • Location: Samar, Mexico
Source: World Bank Group
In March 2009, Iberdrola Renovables, a subsidiary of Iberdrola SA, won a concession to build and operate the 103-MW La Venta 3 wind farm in Oaxaca state. The project was to be located in the Municipality of Santa Domingo Ingenio, in the region of the Istmo de Tehuantepec, close to already existing wind farms La Ventosa and La Venta II.
The contract included a 20-year Power Purchase Agreement (PP
- Status
- Prospective
- Sector
- Commercial, Wind, Government, Power Transmission, Raw Materials, Road, Power Generation (CCGT), Warehouse
- Location
- Samar, Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about La Venta III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In March 2009, Iberdrola Renovables, a subsidiary of Iberdrola SA, won a concession to build and operate the 103-MW La Venta 3 wind farm in Oaxaca state. The project was to be located in the Municipality of Santa Domingo Ingenio, in the region of the Istmo de Tehuantepec, close to already existing wind farms La Ventosa and La Venta II. The contract included a 20-year Power Purchase Agreement (PPA) with CFE, Mexico's federal electricity company. The farm was to use 121 G52 wind turbines sourced from Gamesa Eolica, each measuring 44m in height and with an output of 850kw. The project will also include the construction of access roads and interconnection with the high-voltage network.It was expected to meet the energy needs of around 200,000 people, avoiding the emission of 160,000 tonnes of CO2 annually. The total project cost was US $225 million. The project reached financial closure through a loan agreement signed in May 2010, from the European Investment Bank (EIB) for EUR 78.50 million (US $112.50 million). Operations commenced in March 2012. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Mexico |
State | Samar |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Wind, Government, Power Transmission, Raw Materials, Road, Power Generation (CCGT), Warehouse |
Article published date | 2024-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
