logo
ProjectClosed

La Villa/Edcouch/Elsa Phase II

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The project includes construction of a new pump and gate structure south of the existing dual 5'x5' box culverts. Improvements consist of a 9'x5' cast-in-place box with a permanent vertical pump, a 5'x5' cast-in-place box with a sluice gate, and an 8'x8' castin-place outfall box. Additional work includes ditch realignment, energy dissipators, concrete riprap, erosion control, and a pre-engineered

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Cement, Government, Metal, Manufacturing (Industrial), Commercial
Location
Edinburg, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about La Villa/Edcouch/Elsa Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “La Villa/Edcouch/Elsa Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in Edinburg, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes construction of a new pump and gate structure south of the existing dual 5'x5' box culverts. Improvements consist of a 9'x5' cast-in-place box with a permanent vertical pump, a 5'x5' cast-in-place box with a sluice gate, and an 8'x8' castin-place outfall box. Additional work includes ditch realignment, energy dissipators, concrete riprap, erosion control, and a pre-engineered metal canopy. All work will follow HCDD1 and IBWC design standards and specifications.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Edinburg

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Cement, Government, Metal, Manufacturing (Industrial), Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project