logo

Laayoune 100 MW Wind Power Farm

Sector: Power Generation (CCGT) • Location: Laayoune, Morocco

Source: The North Africa Post

Project
Planned

A 100 MW wind power farm project in the Moroccan Saharan Laayoune-Sakia El Hamra region, developed through a partnership between Moroccan Ynna Holding and Emirati AMEA Power. The project aims to contribute to Morocco's goal of generating over 52% of its electricity from renewable sources by 2030 and reduce CO₂ emissions by over 330,000 tons annually. The wind farm is expected to be operational in

Status
Prospective
Sector
Power Generation (CCGT), Wind, Raw Materials
Location
Laayoune, Morocco
Updated
22 Jul 2026
Source
The North Africa Post

ConstructChat

Ask ConstructChat about Laayoune 100 MW Wind Power Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Laayoune 100 MW Wind Power Farm” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Laayoune, Morocco. Taiyo aggregates data on it from The North Africa Post.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 100 MW wind power farm project in the Moroccan Saharan Laayoune-Sakia El Hamra region, developed through a partnership between Moroccan Ynna Holding and Emirati AMEA Power. The project aims to contribute to Morocco's goal of generating over 52% of its electricity from renewable sources by 2030 and reduce CO₂ emissions by over 330,000 tons annually. The wind farm is expected to be operational in 2027 and will supply green electricity to power all Ynna's subsidiaries, enhancing energy sovereignty and sustainability.

Original sector

Energy

Location

Country

Morocco

City

Laayoune

Source

Source

The North Africa Post

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Wind, Raw Materials

Article published date

2025-06-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project