Labcon North America Expansion Project
Sector: Aerospace & Defense • Location: California, United States of America (USA)
Source: City of Petaluma
This project is comprised of two elements: Zoning Map Amendment (ZMA) and associated amendment to the Lakeville Business Park Planned Community Development (Lakeville PCD). The ZMA is requested to change the zoning designation for 6.51-acres from Planned Unit Community District (PCD) to Business Park (BP) and an amendment to the Lakeville PCD to remove all references to the parcels that comprise t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project is comprised of two elements: Zoning Map Amendment (ZMA) and associated amendment to the Lakeville Business Park Planned Community Development (Lakeville PCD). The ZMA is requested to change the zoning designation for 6.51-acres from Planned Unit Community District (PCD) to Business Park (BP) and an amendment to the Lakeville PCD to remove all references to the parcels that comprise the 6.51-acres that are subject to the zoning map amendment. Site Plan and Architectural Review (SPAR) is requested to allow for the construction of a new manufacturing building with ±176,000 square feet of floor area, associated parking, and other on-site improvements. Proposed site improvements include five full-size loading berths and one smaller loading berth, 132 new paved parking spaces, and 138 new landscaped parking reserve spaces. The new building would overlap with a portion of the existing ±103,000 square foot building to provide for an all-weather and secure connection. Post construction, the 16.33-acre parcel would include ±288,000 square feet of total floor area, with Labcon North America using ±247,000 square feet as a manufacturing, warehousing, and distribution facility, and Steris Corporation using ±40,000 square feet as a sterilization facility. The Labcon North America Expansion Project would be funded in part by a $59.3 million contract award from the U.S. Department of Defense on behalf of and in coordination with the U.S. Department of Health and Human Services. According to the applicant, the award was granted to support Labcon's production of pipette tips and tubes as part of the supply chain for COVID-19 diagnostic testing. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
