logo
ProjectCompleted

Lac des Milles Lacs Green Energy Project

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

Phase 1:The Lac des Mille Lacs First Nations is limited in their energy options. Diesel supplied electricity is the primary energy source in the community. It is expensive and becoming more expensive each year. The community administration are struggling with rising costs of energy and are seeking solutions, especially opportunities for green energy. The proposed project is a Community Micro-Grid

Status
Closed
Sector
Solar, Water Supply and Storage, Energy Storage, Power Generation (CCGT), Commercial, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Lac des Milles Lacs Green Energy Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lac des Milles Lacs Green Energy Project” is an infrastructure initiative in the Solar sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase 1:The Lac des Mille Lacs First Nations is limited in their energy options. Diesel supplied electricity is the primary energy source in the community. It is expensive and becoming more expensive each year. The community administration are struggling with rising costs of energy and are seeking solutions, especially opportunities for green energy. The proposed project is a Community Micro-Grid combined with Energy and Conservation Measures (ECMs). It will provide an integrated solution for a Solar System for the Community Cultural Complex and Roundhouse buildings and will include non-exporting grid interactive Solar electricity generation. The Solar energy generated will be used to power internal building loads only. Any excess generation is stored in batteries. There is no export to the grid, even during temporary times of production that exceed load. Any shortfall is sourced from the grid. In this way, the renewable energy offsets the cost of powering local loads without the need for grid connection. The integrated solution components and architecture drawings are including in the Appendix B. ECMs will vary according to needs to be identified via energy audits including insulation, heat pumps, photovoltaic (PV) water pre-heat, etc. Technology innovation will include the development of community level smart-grid custom software for ongoing maintenance and monitoring. The solution will be constructed employing community members. Phase 2 (500 kW solar ground mount): This project will be done under the Ontario Power Authority Feed-in Tariff (OPA FIT 4) program and will bring needed and welcomed revenue to the Lac des Mille Lacs First Nation to the benefit of the community.

Original sector

Green Energy

Budget

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Solar, Water Supply and Storage, Energy Storage, Power Generation (CCGT), Commercial, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project