Lac des Milles Lacs Green Energy Project
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
Phase 1:The Lac des Mille Lacs First Nations is limited in their energy options. Diesel supplied electricity is the primary energy source in the community. It is expensive and becoming more expensive each year. The community administration are struggling with rising costs of energy and are seeking solutions, especially opportunities for green energy. The proposed project is a Community Micro-Grid
- Status
- Closed
- Sector
- Solar, Water Supply and Storage, Energy Storage, Power Generation (CCGT), Commercial, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Lac des Milles Lacs Green Energy Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 1:The Lac des Mille Lacs First Nations is limited in their energy options. Diesel supplied electricity is the primary energy source in the community. It is expensive and becoming more expensive each year. The community administration are struggling with rising costs of energy and are seeking solutions, especially opportunities for green energy. The proposed project is a Community Micro-Grid combined with Energy and Conservation Measures (ECMs). It will provide an integrated solution for a Solar System for the Community Cultural Complex and Roundhouse buildings and will include non-exporting grid interactive Solar electricity generation. The Solar energy generated will be used to power internal building loads only. Any excess generation is stored in batteries. There is no export to the grid, even during temporary times of production that exceed load. Any shortfall is sourced from the grid. In this way, the renewable energy offsets the cost of powering local loads without the need for grid connection. The integrated solution components and architecture drawings are including in the Appendix B. ECMs will vary according to needs to be identified via energy audits including insulation, heat pumps, photovoltaic (PV) water pre-heat, etc. Technology innovation will include the development of community level smart-grid custom software for ongoing maintenance and monitoring. The solution will be constructed employing community members. Phase 2 (500 kW solar ground mount): This project will be done under the Ontario Power Authority Feed-in Tariff (OPA FIT 4) program and will bring needed and welcomed revenue to the Lac des Mille Lacs First Nation to the benefit of the community. |
Original sector | Green Energy |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Solar, Water Supply and Storage, Energy Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Canada
- Calgary Board of Education K-4 School Bundle
- Acden Corporate Headquarters and Fleet Facility
- Bluenose Academy
- Brandon - Transit Shelters Lighting Project
- Grand Renewable Energy Park Haldimand County Ontario
- Sheridan College Hazel McCallion Campus (Phase 2)
- Solar System for Community Cultural Complex and Roundhouse
- Sol Aurora Solar Project
