LA/DOT: LA 27 Bridge Repair (CO 008) REBID
One of 10,000+ projects Taiyo tracks in Louisiana.
Source: Dodge USA
La 27 Bridge Repair Located On The Route La 27 Ellender Bridge Over The Gulf Intracoastal Waterway. Located At The Kelso Bayou Bridge On Route La 27 From North Of Its Junction With Bourg Port To South Of Its Junction With N Dj Ln
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Seaport, Road, Commercial
- Location
- Sulphur, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about LA/DOT: LA 27 Bridge Repair (CO 008) REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | La 27 Bridge Repair Located On The Route La 27 Ellender Bridge Over The Gulf Intracoastal Waterway. Located At The Kelso Bayou Bridge On Route La 27 From North Of Its Junction With Bourg Port To South Of Its Junction With N Dj Ln |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Sulphur |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Seaport, Road, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
