LA/DOT:LA 178 D03 Geopolymer Pipe Lining
Sector: Water Supply and Storage • Location: Baton Rouge, Louisiana, United States of America
Source: Dodge USA
Description: D03 Geopolymer Pipe Lining (La 178) Route: La 178 Non-nhs Route Parish: St Landry Type: Geopolymer Lining Structural Steel Plate Pipes Site #1: The Site Is Located On La 178, Approximately 0.866 Mile East Of Its Intersection With La 357. Site #2: The Site Is Located On La 178, Approximately 1.199 Miles East Of Its Intersection With La 357. Site #3: The Site Is Located On La 178, Appro
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Steel, Waste Processing and Treatment, Road, Metal
- Location
- Baton Rouge, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about LA/DOT:LA 178 D03 Geopolymer Pipe Lining
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Description: D03 Geopolymer Pipe Lining (La 178) Route: La 178 Non-nhs Route Parish: St Landry Type: Geopolymer Lining Structural Steel Plate Pipes Site #1: The Site Is Located On La 178, Approximately 0.866 Mile East Of Its Intersection With La 357. Site #2: The Site Is Located On La 178, Approximately 1.199 Miles East Of Its Intersection With La 357. Site #3: The Site Is Located On La 178, Approximately 1.438 Miles East Of Its Intersection With La 357. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Baton Rouge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Steel, Waste Processing and Treatment, Road, Metal |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
