logo

Laem Chabang 1 & 2 Electricity and Steam Power Project

Sector: Fertilizers • Location: Thailand

Source: World Bank Group

Project
Active

The 163MW Laem Chabang 1 & 2 Electricity and Steam Power reached financial closure in June 2015, as the sole bookrunner and mandated lead arranger Kasikorn Bank, along with joint mandated lead arranger Land & Houses Bank Public Co Ltd raised a US$50.114 million loan to develop a facility that generates and sells electricity and steam to EGAT and Industrial Users in the industrial estate. Borrower

Project Information FAQ

Project Information

5 Q
The project “Laem Chabang 1 & 2 Electricity and Steam Power Project” is an infrastructure initiative in the Fertilizers sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The 163MW Laem Chabang 1 & 2 Electricity and Steam Power reached financial closure in June 2015, as the sole bookrunner and mandated lead arranger Kasikorn Bank, along with joint mandated lead arranger Land & Houses Bank Public Co Ltd raised a US$50.114 million loan to develop a facility that generates and sells electricity and steam to EGAT and Industrial Users in the industrial estate. Borrower of the loan was SPV B Grimm Power (Laem Chabang) 1 & 2 Ltd, a subsidiary of the project sponsor B.Grimm Power Limited project. This greenfield BOO project was to be located in the industrial estate in eastern part of Thailand and the total estimated cost was US$95 million(Bt3.4 billion). In June 2014, B.Grimm Power, a small power producer ("SPP") in Thailand, acquired two gas-fired combined-cycle cogeneration plants with total electricity capacity of 163MW and total steam capacity of 70 tons/hour, located in Laem Chabang Industrial Estate in Chonburi province Thailand, from Sime Darby Energy Pte. Ltd ("SDEPL"), an indirect wholly-owned subsidiary of Sime Darby Berhad ("Sime Darby"). Two power plants should be considered as one package in the context of transaction process, investment commitment, debt financing, financial closing as well as publicly available information Captive percentage is not available.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data