Lafayette & Walnut Creek WTP Chemical System Safety Impvts
Sector: Water Supply and Storage • Location: Walnut Creek, California, United States of America
Source: Dodge
Work includes: A. Demolition and replacement of chemical feed systems for primary coagulant, coagulant polymer, sodium hypochlorite, ammonia, caustic soda, and fluoride, including bulk tanks, pumps, injection quills and diffusers, and chemical piping from truck unloading to chemical injection. B. Installation of temporary chemical feed and storage systems for plant operation during construction of
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Chemical (Industrial), Hydrogen, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Walnut Creek, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lafayette & Walnut Creek WTP Chemical System Safety Impvts
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work includes: A. Demolition and replacement of chemical feed systems for primary coagulant, coagulant polymer, sodium hypochlorite, ammonia, caustic soda, and fluoride, including bulk tanks, pumps, injection quills and diffusers, and chemical piping from truck unloading to chemical injection. B. Installation of temporary chemical feed and storage systems for plant operation during construction of these improvements. Installation of a temporary maintenance storage facility (Walnut Creek WTP o... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Walnut Creek |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Chemical (Industrial), Hydrogen, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
