Laffan Refinery 2 (LR 2) is a new condensate refinery built in Ras Laffan Industrial City in Qatar, with an investment of $1.5bn. The refinery commenced production in December 2016 and was officially opened in February 2017. It has the capacity to process 146,000 barrels of condensate a day from the North Field, which is the world’s biggest single natural gas field by reserves. Naphtha, Jet-A1 fue

Project Information FAQ

Project Information

4 Q
The project “Laffan Refinery 2, Ras Laffan” is an infrastructure initiative in the Energy Storage sector, located in World. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Laffan Refinery 2 (LR 2) is a new condensate refinery built in Ras Laffan Industrial City in Qatar, with an investment of $1.5bn. The refinery commenced production in December 2016 and was officially opened in February 2017. It has the capacity to process 146,000 barrels of condensate a day from the North Field, which is the world’s biggest single natural gas field by reserves. Naphtha, Jet-A1 fuel, diesel fuel, propane and butane are all produced at the new site. LR 2 will increase the refinery capacity of Qatar Petroleum to meet the demand for cleaner fuel products, while increasing the export of diesel and other refined products to domestic and overseas markets across south-east Asia and Europe. Developed as an expansion to the Laffan Refinery 1, the LR2 project forms part of Qatar National Vision 2030 for guaranteeing efficient energy distribution for the nation, while meeting the most stringent environmental standards. Laffan Refinery 2 is a joint venture between Qatar Petroleum (84%), Total (10%), Cosmo (2%), Idemitsu (2%), Mitsui (1%) and Marubeni (1%). Total signed the joint venture (JV) agreement with Qatar Petroleum, along with the four Japanese firms, to construct a new condensate refinery and a diesel hydrotreater in April 2013. The stakeholders established a JV company named Laffan Refinery Company Limited 2 for the project. The new refinery is built adjacent to Laffan Refinery 1, which was commissioned in 2009. Construction on the new facility began with the laying of foundation stone in April 2014, and was completed in December 2016. Laffan Refinery 2 is made up of major units such as distillation units, naphtha and kerosene hydrotreaters, hydrogen unit and a saturation gas plant. It has doubled the capacity of the refinery complex, with a throughput of 146,000 barrels of condensate a day. The facility features a new diesel hydrotreater (DHT) and a new gas oil deep desulphurisation unit. The DHT processes 54,000 barrels a stream day of straight run gasoil feedstock from the LR1 and LR2 facilities. The condensate refinery also includes a wastewater plant to treat and recycle industrial water from LR 1 and LR 2. Treated water is reused for cooling and feeding the boiler, in order to reduce the overall water intake and discharge of treated industrial water from the facilities. The new refinery shares certain facilities with the Laffan Refinery 1 to attain high efficiency in refinery operations. It also has the ability to operate in hot, arid and costal climatic conditions. The Laffan Refinery Company placed a lump sum front-end engineering design (FEED) contract with Technip for the Laffan Refinery 2 project in August 2011. Chiyoda and CTCI were jointly awarded a contract by Qatargas for the engineering, procurement, supply, construction and commissioning (EPSCC) of the Laffan Refinery 2 project in May 2013. Nexans was subcontracted by Chiyoda and CTCI to supply more than 1,000km of cable, including low and medium-voltage single and multi-core, armoured, IEC standard, flame-resistant cables for the refinery. SNC-Lavalin was awarded a contract by Qatargas for the engineering, procurement, supply, construction and commissioning of a water recycling facility at the Laffan Refinery 2 in November 2015. The system supplied by SNC-Lavalin includes ultra-filtration, reverse osmosis and auxiliary facilities. Idemitsu was responsible to provide technicians to support the development and operations of the LR 2.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data