Lagoon Cleaning at Wastewater Treatment Facility
Sector: Water Supply and Storage • Location: Kirksville, Missouri, United States of America
Source: Dodge USA
The major proposed work includes: Remove up to 500 dry tons of sludge from the Wastewater Treatment Plant Sludge Lagoon the first year and up to 500 dry ton per year contingent on approval of each year s budget through 2026.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government, Waste Processing and Treatment
- Location
- Kirksville, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lagoon Cleaning at Wastewater Treatment Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The major proposed work includes: Remove up to 500 dry tons of sludge from the Wastewater Treatment Plant Sludge Lagoon the first year and up to 500 dry ton per year contingent on approval of each year s budget through 2026. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Kirksville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Waste Processing and Treatment |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
