Lagoon Outfall Upgrades
Completed · British Columbia
Source: Infrastructure Canada
The project works will include: - Temporary isolation of flow from the construction site; - Excavation and installation of new outfall pipe; - Repair of riprap dyke if needed; - Installation and removal of temporary bridge to access to the right bank; - Excavation and installation of rock vanes; and, - Reclamation of areas disturbed by project works.
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Lagoon Outfall Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project works will include: - Temporary isolation of flow from the construction site; - Excavation and installation of new outfall pipe; - Repair of riprap dyke if needed; - Installation and removal of temporary bridge to access to the right bank; - Excavation and installation of rock vanes; and, - Reclamation of areas disturbed by project works. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
