Lagoon Road Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Excavate existing ground depth of excavation mainly 150mm, with some 300mm required, which will be identified by District staff on site upon award, construct approximately 480m of 4.5m wide gravel road as described following.
- Status
- Closed
- Sector
- Road, Government, Commercial
- Location
- Chetwynd, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lagoon Road Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Excavate existing ground depth of excavation mainly 150mm, with some 300mm required, which will be identified by District staff on site upon award, construct approximately 480m of 4.5m wide gravel road as described following. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Chetwynd |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
