LaGrange Water Meter / Pit Replacement & Upgrades
Sector: Water Supply and Storage • Location: La Grange, Wyoming, United States of America
Source: Dodge
We plan on replacing existing valves that do not close completely and valves that are non operable. The existing service lines are tapped directly into C900 PVC pipe without the use of saddles that do not allow them to be shut off without breaking the mainline or shutting down sections of the main system
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- La Grange, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about LaGrange Water Meter / Pit Replacement & Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | We plan on replacing existing valves that do not close completely and valves that are non operable. The existing service lines are tapped directly into C900 PVC pipe without the use of saddles that do not allow them to be shut off without breaking the mainline or shutting down sections of the main system |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | La Grange |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
