Laguna Creek Trail & West Stockton Blvd Multi Modal Improve
Sector: Commercial • Location: Elk Grove, California, United States of America
Source: Dodge USA
documents and shall consist of the following: clearing and grubbing, tree removals, earthwork, drainage facilities, new asphalt path, curb ramps, Rapid Rectangular Flashing Beacon, crack sealing, pavement repairs, micro-surfacing, traffic signs, striping, and markings, erosion control, landscaping, and other related elements. The Laguna Creek Trail and West Stockton Blvd. Multi Modal Improvements
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Mass Transit, Government, Rail
- Location
- Elk Grove, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Laguna Creek Trail & West Stockton Blvd Multi Modal Improve
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | documents and shall consist of the following: clearing and grubbing, tree removals, earthwork, drainage facilities, new asphalt path, curb ramps, Rapid Rectangular Flashing Beacon, crack sealing, pavement repairs, micro-surfacing, traffic signs, striping, and markings, erosion control, landscaping, and other related elements. The Laguna Creek Trail and West Stockton Blvd. Multi Modal Improvements Project includes resurfacing approximately 2,800 feet of Class I multi-use trail parallel and sou... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Elk Grove |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Mass Transit, Government, Rail |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
