Lahore metro line BOT project
Sector: Road • Location: Pakistan
Source: InfraPPPWorld
The new metro line, which will be the first in Lahore, will connect Raiwind, Multan Road, Mcleod Road, Lahore Junction Railway Station and the Grand Trunk Road. It will have a length of 27.1 km, of which 25.4 km will run elevated. A total of 26 stations will be constructed on the route.The metro will have capacity for two trains running both up and down the track and will be capable to handle up t
- Status
- Prospective
- Sector
- Road, Rail, Mass Transit
- Location
- Pakistan
- Updated
- 19 Nov 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Lahore metro line BOT project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The new metro line, which will be the first in Lahore, will connect Raiwind, Multan Road, Mcleod Road, Lahore Junction Railway Station and the Grand Trunk Road. It will have a length of 27.1 km, of which 25.4 km will run elevated. A total of 26 stations will be constructed on the route.The metro will have capacity for two trains running both up and down the track and will be capable to handle up to 30,000 passengers per hour. The project is expected to benefit about 250,000 passenger a day at the beginning and 500,000 passenger a day by 2025. |
Original sector | Transport |
Budget |
Location
Country | Pakistan |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Road, Rail, Mass Transit |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
