Lahore’s BRT build-operate-transfer project
Sector: Road • Location: Pakistan
Source: InfraPPPWorld
Contract to build two Buss Rapid Transit (BRT) routes on "Built Operate and Transfer" basis. This will include design, build, finance, operate and transfer of project on following two corridors in Lahore:- Ferozepur Road 28.7 Km- Multan Road 12.4 Km
- Status
- Closed
- Sector
- Road
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Lahore’s BRT build-operate-transfer project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contract to build two Buss Rapid Transit (BRT) routes on "Built Operate and Transfer" basis. This will include design, build, finance, operate and transfer of project on following two corridors in Lahore:- Ferozepur Road 28.7 Km- Multan Road 12.4 Km |
Original sector | Transport |
Procurement method |
Location
Country | Pakistan |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
