Lajari Small Hydro Power Plant
Sector: Hydro • Location: Brazil
Source: World Bank Group
In August 2015, the Brazilian company Lajari Energetica S.A., a partnership of the Brazilian companies LLV Empreendimentos (75%) and RER Empreendimentos (25%), was granted the 35-year contract to build and operate the Lajari Small Hydro Power Plant (20.8 MW total capacity), located at the municipality of Alto Taquari, state of Mato Grosso (Taquari River). The power plant was named PCH Lajari.
In
- Status
- Prospective
- Sector
- Hydro, Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Lajari Small Hydro Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In August 2015, the Brazilian company Lajari Energetica S.A., a partnership of the Brazilian companies LLV Empreendimentos (75%) and RER Empreendimentos (25%), was granted the 35-year contract to build and operate the Lajari Small Hydro Power Plant (20.8 MW total capacity), located at the municipality of Alto Taquari, state of Mato Grosso (Taquari River). The power plant was named PCH Lajari. In November 2014, the company had been granted power purchase agreements to sell electricity to distribution companies starting in 2019. The company presented a winning bid of US$ 68.4/MWh (BRL 160.9/MWh). The investment committed to the power plant was estimated at US$ 34.8 million (BRL 110.7 million). Financial closure was achieved in January 2017, when the sponsor was granted a US$ 22.8 million (BRL 72.6 million) loan from the Brazilian bank BNDES. The remaining investment cost was financed with the sponsor's equity. Commercial operations were expected to commence in December 2018. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project