Lajes Energia S.A., a subsidiary of the Brazilian company Light (a joint-venture of the state-owned company Cemig (31%), state-owned bank BNDES (9%), Andrade Gutierrez (8%) and investment funds (52%)), was granted the authorization to build and operate a 17-MW hydro power plant located in the state of Rio de Janeiro (Ribeirao das Lajes River). The power plant was named PCH Lajes and its constructi

Status
Prospective
Sector
Commercial, Government, Hydro, Manufacturing (Industrial), Power Generation (CCGT), Road, Steel
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Lajes Small Hydro Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lajes Small Hydro Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Lajes Energia S.A., a subsidiary of the Brazilian company Light (a joint-venture of the state-owned company Cemig (31%), state-owned bank BNDES (9%), Andrade Gutierrez (8%) and investment funds (52%)), was granted the authorization to build and operate a 17-MW hydro power plant located in the state of Rio de Janeiro (Ribeirao das Lajes River). The power plant was named PCH Lajes and its construction was set to replace an old power plant that ceased to operate in 1989. A 30-year authorization contract was granted by the regulatory agency ANEEL in May 1996, and this authorization was transferred to Light S.A. in August 2013. In March 2015, a power purchase agreement was signed with Light Energia for a total of 8 MW. The investment committed to the power plant was estimated at US$ 21 million (BRL 70 million). The EPC contract was signed with WEG Equipamentos Eletricos S.A. e Hidraulica Industrial S.A in August 2014. Construction works commenced in the same month and were nearly concluded by December 2015. Commercial operations were expected to commence in May 2016. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. In May 2016, the state-owned bank BNDES approved a US$ 11.2 million (BRL 51.6 million) loan to the project.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Hydro, Manufacturing (Industrial), Power Generation (CCGT), Road, Steel

Article published date

2024-06-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project