Lajes Energia S.A., a subsidiary of the Brazilian company Light (a joint-venture of the state-owned company Cemig (31%), state-owned bank BNDES (9%), Andrade Gutierrez (8%) and investment funds (52%)), was granted the authorization to build and operate a 17-MW hydro power plant located in the state of Rio de Janeiro (Ribeirao das Lajes River). The power plant was named PCH Lajes and its constructi
- Status
- Prospective
- Sector
- Commercial, Government, Hydro, Manufacturing (Industrial), Power Generation (CCGT), Road, Steel
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Lajes Small Hydro Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Lajes Energia S.A., a subsidiary of the Brazilian company Light (a joint-venture of the state-owned company Cemig (31%), state-owned bank BNDES (9%), Andrade Gutierrez (8%) and investment funds (52%)), was granted the authorization to build and operate a 17-MW hydro power plant located in the state of Rio de Janeiro (Ribeirao das Lajes River). The power plant was named PCH Lajes and its construction was set to replace an old power plant that ceased to operate in 1989. A 30-year authorization contract was granted by the regulatory agency ANEEL in May 1996, and this authorization was transferred to Light S.A. in August 2013. In March 2015, a power purchase agreement was signed with Light Energia for a total of 8 MW. The investment committed to the power plant was estimated at US$ 21 million (BRL 70 million). The EPC contract was signed with WEG Equipamentos Eletricos S.A. e Hidraulica Industrial S.A in August 2014. Construction works commenced in the same month and were nearly concluded by December 2015. Commercial operations were expected to commence in May 2016. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. In May 2016, the state-owned bank BNDES approved a US$ 11.2 million (BRL 51.6 million) loan to the project. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Hydro, Manufacturing (Industrial), Power Generation (CCGT), Road, Steel |
Article published date | 2024-05-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia