Lake Bonney Battery Energy Storage System

Sector: Commercial • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The Lake Bonney Battery Energy Storage System project involves the installation, testing and commercial operation of a 25MW / 52MWh Tesla battery energy storage system that will be co-located with the existing 278.5MW Lake Bonney wind farm in South Australia.The battery will provide new dispatchable generation in South Australia to help meet peak demand, as well as critical system balancing servic

Project Information FAQ

Project Information

5 Q
The project “Lake Bonney Battery Energy Storage System” is an infrastructure initiative in the Commercial sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Lake Bonney Battery Energy Storage System project involves the installation, testing and commercial operation of a 25MW / 52MWh Tesla battery energy storage system that will be co-located with the existing 278.5MW Lake Bonney wind farm in South Australia.The battery will provide new dispatchable generation in South Australia to help meet peak demand, as well as critical system balancing services (known as frequency controlled ancillary services). In doing so, the battery will place downward pressure on electricity prices, improve power quality and system security.How the project worksThe Lake Bonney Battery Energy Storage System project appointed Tesla as the EPC contractor and will be supported by Consolidated Power Project (CPP) for installation and balance of plant in two stages with the first stage (25 MW / 33 MWh) expected to be commissioned by March 2019 and the second stage (25 MW / 52 MWh) by May 2019. Infigen will own and operate the battery, which will be connected to the National Electricity Market via the Mayurra substation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data