Lake County Reelfoot Sewer System Rehabilitation REBID
One of 10,000+ projects Taiyo tracks in Tennessee.
Source: Dodge
The work includes sewer rehabilitation to correct as many identified defects as possible. Construction methods to focus on point repairs within the system to reduce as much infiltration and inflow as possible
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
- Location
- Tiptonville, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lake County Reelfoot Sewer System Rehabilitation REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes sewer rehabilitation to correct as many identified defects as possible. Construction methods to focus on point repairs within the system to reduce as much infiltration and inflow as possible |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Tiptonville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
