Lake Cumberland RA Hangar Improvements REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Scope - The Lump Sum Bid for the project consists of the replacement of the existing T-Hangar roof (with new PVC roof 20 yr. min warranty, replacing of existing damaged portions of decking will be required, see specs), repairing existing CMU walls and waterproofing of the structure (new roof edges, facia, gutters, downspouts, splash blocks and painting exterior CMU walls)
- Status
- Closed
- Sector
- Airport, Government, Commercial, Manufacturing (Industrial)
- Location
- Somerset, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lake Cumberland RA Hangar Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Lump Sum Bid for the project consists of the replacement of the existing T-Hangar roof (with new PVC roof 20 yr. min warranty, replacing of existing damaged portions of decking will be required, see specs), repairing existing CMU walls and waterproofing of the structure (new roof edges, facia, gutters, downspouts, splash blocks and painting exterior CMU walls) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Somerset |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Airport, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in United States of America
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- AIRPORT ROAD IN VIDALIA - TIA
- ATLANTA-CCO - CRRSA
- DAWSON - CARES ACT
- PROJECT ADMINISTRATION - FAA-3-13-SBGP-04-2009 - FY09 DISCR
- McRAE-ENVIRON. ASSMT. FOR PARALLEL TAXIWAY AREA IMPROVMENT
- REIDSVILLE- FUEL FACILITY CARD READER AND DESIGN OF RUNWAY
