Lake Eleanor Drainage Improvement
Sector: Waste Processing and Treatment • Location: Wayne, Illinois, United States of America
Source: Dodge
The project will consist of the installation of five (5) 24-in. diameter Type C inlets; each fitted with a cast iron frame and beehive lid. Approximately 685 LF of 6-in. or 8-in. perforated pipe. All trenches shall be filled, wrapped with geotextile fabric as specified in the plan set, covering an estimated 290 SQ YD of fabric. 1 flared end section. Restoration efforts include 1,500 SQ YD of 4 top
- Status
- Closed
- Sector
- Waste Processing and Treatment, Raw Materials, Road, Water Supply and Storage, Manufacturing (Industrial), Commercial, Metal, Government, Steel
- Location
- Wayne, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lake Eleanor Drainage Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will consist of the installation of five (5) 24-in. diameter Type C inlets; each fitted with a cast iron frame and beehive lid. Approximately 685 LF of 6-in. or 8-in. perforated pipe. All trenches shall be filled, wrapped with geotextile fabric as specified in the plan set, covering an estimated 290 SQ YD of fabric. 1 flared end section. Restoration efforts include 1,500 SQ YD of 4 topsoil, seeding, and erosion control blanket. Approximately 100 SQ YD of brick paver driveway resto... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Wayne |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Raw Materials, Road, Water Supply and Storage, Manufacturing (Industrial), Commercial, Metal, Government, Steel |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
