logo

Lake Hodges Dam Replacement

Sector: Commercial • Location: San Diego, California, United States of America

Source: Dodge USA

Project
Closed

The City has a need for a Design Professional and an environmental services consultant to support the demolition and replacement of Hodges Dam with a new RCC Dam (Project). The City intends to deliver construction of the Project via Construction Manager at Risk (CMAR) project delivery method. The Scope of Services for the Design Professional is separated into two major functions: Facility Design a

Status
Closed
Sector
Commercial, Water Supply and Storage, Government, Hydro, Manufacturing (Industrial)
Location
San Diego, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Lake Hodges Dam Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lake Hodges Dam Replacement” is an infrastructure initiative in the Commercial sector, located in San Diego, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City has a need for a Design Professional and an environmental services consultant to support the demolition and replacement of Hodges Dam with a new RCC Dam (Project). The City intends to deliver construction of the Project via Construction Manager at Risk (CMAR) project delivery method. The Scope of Services for the Design Professional is separated into two major functions: Facility Design and Environmental Permitting. Facility Design shall include full engineering design, including con...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Diego

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Government, Hydro, Manufacturing (Industrial)

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project