Lake Hodges Dam Replacement
Sector: Commercial • Location: San Diego, California, United States of America
Source: Dodge USA
The City has a need for a Design Professional and an environmental services consultant to support the demolition and replacement of Hodges Dam with a new RCC Dam (Project). The City intends to deliver construction of the Project via Construction Manager at Risk (CMAR) project delivery method. The Scope of Services for the Design Professional is separated into two major functions: Facility Design a
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Government, Hydro, Manufacturing (Industrial)
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lake Hodges Dam Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City has a need for a Design Professional and an environmental services consultant to support the demolition and replacement of Hodges Dam with a new RCC Dam (Project). The City intends to deliver construction of the Project via Construction Manager at Risk (CMAR) project delivery method. The Scope of Services for the Design Professional is separated into two major functions: Facility Design and Environmental Permitting. Facility Design shall include full engineering design, including con... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Government, Hydro, Manufacturing (Industrial) |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
