Lake Kickapoo Pump Station Rehabilitation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The existing Lake Kickapoo Pump Station is over 60 years old and has had only minor changes made to it over the course of that time. Current work in the station is not easy for the maintenance crews to perform because of the limited space that is left after previous expansions to the equipment. This facility needs to be demolished and a new building constructed to house the expanding size and amou
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government
- Location
- Wichita Falls, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lake Kickapoo Pump Station Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The existing Lake Kickapoo Pump Station is over 60 years old and has had only minor changes made to it over the course of that time. Current work in the station is not easy for the maintenance crews to perform because of the limited space that is left after previous expansions to the equipment. This facility needs to be demolished and a new building constructed to house the expanding size and amount of equipment. Maintenance equipment should be built into the new structure to help facilitate ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Wichita Falls |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
