Lake Lure Dam Stabilization and Replacement Project
Sector: Hydro • Location: Lake Lure, North Carolina, United States
Source: BlueRidgeNow.com
The Lake Lure Dam, completed in 1927, faced significant challenges during Tropical Storm Helene, which resulted in the need for immediate repairs and future plans for a replacement dam with enhanced flood control capabilities. The project aims to stabilize the existing dam and design a new structure to better manage flood risks.
- Status
- Under Construction
- Sector
- Hydro, Water Supply and Storage
- Location
- Lake Lure, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- BlueRidgeNow.com
ConstructChat
Ask ConstructChat about Lake Lure Dam Stabilization and Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Lake Lure Dam, completed in 1927, faced significant challenges during Tropical Storm Helene, which resulted in the need for immediate repairs and future plans for a replacement dam with enhanced flood control capabilities. The project aims to stabilize the existing dam and design a new structure to better manage flood risks. |
Original sector | Water Management |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Lake Lure |
Source
Source | BlueRidgeNow.com |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage |
Article published date | 2025-04-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
