Lake Manor - Lake Manor Dr at Thompson Ave
Sector: Energy Storage • Location: California, United States of America
Source: LA County Department of Public Work (DPW)
Install a Battery Back-up System (BBS) and phone drop device at Lake Manor Drive at Thompson Avenue. Operational Services Division will complete the work and Traffic Systems will prepare the plan revision and revised traffic signal timing sheets.
- Status
- Under Construction
- Sector
- Energy Storage, Road, Government, Residential
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- LA County Department of Public Work (DPW)
ConstructChat
Ask ConstructChat about Lake Manor - Lake Manor Dr at Thompson Ave
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | development |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Install a Battery Back-up System (BBS) and phone drop device at Lake Manor Drive at Thompson Avenue. Operational Services Division will complete the work and Traffic Systems will prepare the plan revision and revised traffic signal timing sheets. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | LA County Department of Public Work (DPW) |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Road, Government, Residential |
Article published date | 2024-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 14 KW 35 MODULES AND 1 BATTERY 13.5 KWH ESS
- INSTALL (141) TESLA SOLAR ROOF TILES AT 10.152 KW TOTAL. INS TALL (13.5) KWH ENERGY STORAGE SYSTEM AND (N) LOAD CENTER
- 10' SUSPENDED WIRE PERIMETER SECRURITY SYSTEM INSIDE FENCE, BATTERY OPERATED LOW VOLTAGE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.32 KW 12 MODULES AND INSTALL BACK-UP BATTERY 10.5 KWH, EQUIP. ON ENGINEERED FENCE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.2 KW 12 MODULES 1 LG CHEM BATTERY 9.5 KWH
- REMOVE & REPLACE ANTENNAS, RRUS, BATTERY UNIT
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 10.8 KW 27 PANELS 1 NEW TESLA BATTERY NEW 100 AMP SOLAR PANEL
- PHASE 3-DATA CENTER- ENCOMPASSING OF PART OF 3RD FLOOR AHU ELECTRICAL ROOM,BATTERY ROOM,INSALL GENERATORS&EQUIP IN YARD
