logo

Lake Merced Quick-Build Project

Sector: Automotive • Location: San Francisco, California, United States of America

Source: SFMTA Projects

Project
Detailed Design

Lake Merced Quick-Build Project Share this: Facebook Twitter LinkedIn SFMTA.com/LakeMercedQB The Lake Merced Quick-Build Project is starting construction! Construction will start in mid-September on the northern segment between Skyline and Winston Drive. Please see our construction flyer here . Other segments of Lake Merced will start construction over the next few months. Check back or subscribe

Project Information FAQ

Project Information

4 Q
The project “Lake Merced Quick-Build Project” is an infrastructure initiative in the Automotive sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

detailed design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Lake Merced Quick-Build Project Share this: Facebook Twitter LinkedIn SFMTA.com/LakeMercedQB The Lake Merced Quick-Build Project is starting construction! Construction will start in mid-September on the northern segment between Skyline and Winston Drive. Please see our construction flyer here . Other segments of Lake Merced will start construction over the next few months. Check back or subscribe for project updates. Project Introduction The Lake Merced Quick-Build Project proposes roadway reallocation and lane narrowing on segments of Lake Merced Boulevard from Skyline Boulevard to John Muir Drive, promoting traffic calming and allowing for multimodal street improvements. The Lake Merced Quick-Build Project has two principal goals: 1. Install traffic calming improvements to reduce collisions and improve comfort for all travelers along Lake Merced Boulevard 2. Implement safe pedestrian and bicycle connections to or along Lake Merced Boulevard The area north and east of Lake Merced Park on Lake Merced Boulevard between Font and Sunset boulevards is part of San Francisco's Vision Zero High Injury Network (HIN), where 75% of the City's traffic injuries and fatalities occur on just 13% of San Francisco streets. Project Scope: Reallocating parking and traffic lanes (only on some segments) to provide the opportunity to install upgraded pedestrian, bicycle, and transit infrastructure. Narrowing travel lanes widths to increase driver awareness and lower motor vehicle speeds. Upgrading crossings by: Refreshing road paint to improve crosswalk visibility Installing advance limit lines to create buffer between crosswalk and vehicles at stop lights Upgrading transverse crosswalks (crosswalks outlined by only two parallel lines) to continental ("striped") crosswalks Constructing raised crosswalks or speed cushions at slip lanes, where feasible, to slow right-fast turning vehicles Upgrading traffic signal lens size from 8" to 12" Installing on-street bikeways separated from traffic lanes using raised concrete islands to provide extra protection, and comfort for cyclists on the road, particularly on roads like Lake Merced Blvd, which has speed limits greater than 25 miles per hour. Implementing Neighborways to serve as an alternative to constrained streets with high speeds and heavy vehicle traffic. Street design measures include speed humps and wayfinding pavement markings to make residential streets friendlier for walking and biking. Neighborways will be proposed where a traffic-separated bikeway is not feasible along Lake Merced Blvd. Implementing transit boarding islands and stop optimization. Transit boarding islands are dedicated passenger waiting areas that are separated from the sidewalk by a bikeway. Upgrading flag stops to transit boarding islands along Lake Merced Blvd. streamlines transit service by enabling in-lane stops and eliminating bike-bus conflicts. Potential Trade-offs include: Road lane removal in some segments, but only in areas with extra vehicle capacity, and right/left turn lanes will be maintained. Parking removal throughout corridor, areas parked with oversized vehicles will be phased out in correlation with the selection of a Safe Sleeping Site in coordination with District 7. Project Timeline July 2021 Project kickoff! Pending Summer 2021 - Spring 2022 Planning and Design Phase Pending Fall 2022/Early 2023 Internal review & SFMTA Board Approval Pending Fall 2023 Construction Begins Pending Project Status Planning Preliminary Engineering Detailed Design Improvements Bus Routes and Rail Lines 18 46th Avenue 29 Sunset 57 Parkmerced 58 Lake Merced Neighborhoods Lakeshore Streets Lake Merced Boulevard from Skyline Boulevard through John Muir Drive Background The Lake Merced Quick Build Project builds upon two previous studies conducted in coordination with District 7: The Lake Merced Bikeway Feasibility Study was completed in January 2021 using Neighborhood Transportation Improvement Program (NTIP) funding. The primary goal of this study was to understand options for relieving congestion on the multi-use pathway around the lake. This study presents near-term options for adding bikeways at road-level on streets adjacent to the lake and long-term options for widening the multi-use pathway around the lake. This study currently has no funding for implementation. The Lake Merced Pedestrian Community Based Transportation Plan (CBTP) was completed in October 2021.The CBTP prioritizes recommendations for both spot and corridor wide pedestrian safety improvements on Lake Merced Blvd. from Skyline Blvd. to John Muir Dr. The Quick Build scope incorporates many of these identified improvements. Contact Information lakemercedQB@sfmta.com

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data