Lake Needham Bridge Compaction Grouting
Closed · Florida · Last reported Jul 2025
Source: Dodge
The work consists of providing all labor, materials, equipment and incidentals to complete the Subsurface Compaction Grouting Program as detailed in the Bid Plans and Technical Special Provision. The grouting site is located at the western end of the proposed SR 516 bridges over Lake Needham, approximately three-quarters mile southwest of the existing SR 429 interchange with Schofield Rd within Or
- Status
- Closed
- Sector
- Government, Road, Consumer Products, Bridge, Commercial
- Location
- Orlando, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lake Needham Bridge Compaction Grouting
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of providing all labor, materials, equipment and incidentals to complete the Subsurface Compaction Grouting Program as detailed in the Bid Plans and Technical Special Provision. The grouting site is located at the western end of the proposed SR 516 bridges over Lake Needham, approximately three-quarters mile southwest of the existing SR 429 interchange with Schofield Rd within Orange County, Florida |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Orlando |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Road, Consumer Products, Bridge, Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
