logo

LAKE PARK BELLVILLE ROAD FROM SR 7 TO I-75

Sector: Mass Transit • Location: Lake Park, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

PI 0013987 in Lowndes County is proposed to improve Lake Park Bellville Rd from north of the I-75 interchange to SR 7 inside the Lake Park city limits. The project proposes to widen and reconstruct the existing two-lane road to a four lane road with a flush median and rural shoulders from approximately 1400 feet north of the I-75 bridge at Exit 2 to Ocean Pond Avenue where it then transitions to a

Project Information FAQ

Project Information

4 Q
The project “LAKE PARK BELLVILLE ROAD FROM SR 7 TO I-75” is an infrastructure initiative in the Mass Transit sector, located in Lake Park, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

PI 0013987 in Lowndes County is proposed to improve Lake Park Bellville Rd from north of the I-75 interchange to SR 7 inside the Lake Park city limits. The project proposes to widen and reconstruct the existing two-lane road to a four lane road with a flush median and rural shoulders from approximately 1400 feet north of the I-75 bridge at Exit 2 to Ocean Pond Avenue where it then transitions to a 2 lane section with a flush median and urban shoulders. The center turn lane drops at Lane Drive until south of South Railroad Avenue where a left turn lane resumes and the two-way center turn lane continues through the remainder of the project at the intersection with SR 7. The length of the project is approximately 2.7 miles. The project will make operational improvements at the intersections throughout the proposed corridor and upgrade the existing at-grade Georgia Southern & Florida Railway crossing (RR Inv # 713622X).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data