Lake Qaraoun Pollution Prevention Project
Sector: Water Supply and Storage • Location: Lebanon
Source: World Bank
The development objectives of the Lake Qaraoun Pollution Prevention Project for Lebanon are to reduce the quantity of untreated municipal sewage discharged into the Litani River and to improve pollution management around Qaraoun Lake. This project has three components. 1) The first component, Improvement of municipal sewage collection, will finance activities that increase sewerage collection in a
- Status
- Prospective
- Sector
- Water Supply and Storage, Fertilizers, Biomass, Forest Products and Packaging, Commercial, Raw Materials, Waste Processing and Treatment, Government
- Location
- Lebanon
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Lake Qaraoun Pollution Prevention Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objectives of the Lake Qaraoun Pollution Prevention Project for Lebanon are to reduce the quantity of untreated municipal sewage discharged into the Litani River and to improve pollution management around Qaraoun Lake. This project has three components. 1) The first component, Improvement of municipal sewage collection, will finance activities that increase sewerage collection in areas where wastewater treatment plants have been constructed (or planned to be constructed), to maximize the use of these investments. It has four subcomponents as follows: (i) Expansion of sewage network to connect to the Zahlé Wastewater Treatment Plant (WWTP); (ii) Expansion of sewage network to connect to the Anjar WWTP; (iii) Expansion of sewage network to connect to Aitanit and other WWTP; and (iv) Design, supervision, environment and social consultancy services. 2) The second component, Promotion of Good Agricultural Practices, will promote the use of sustainable production systems among farmers in the upper Litani basin, by introducing Good Agricultural Practices (GAP), including reduced fertilizer application and selected Integrated Pest Management (IPM) measures - for example, reduced pesticides application. 3) The third component, Solid Waste, Water Quality Monitoring, Capacity Building, and Project Management, will improve pollution management around Qaraoun Lake through technical assistance. It has five subcomponents as follows: (i) Technical studies in solid waste management; (ii) Improvement in Water Quality Modeling - Litani River Authority (LRA); (iii) Capacity building of the Beqaa Water Establishment (BWE); (iv) Capacity building of the Ministry of Energy and Water (MoEW); and (v) Project management. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Lebanon |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Fertilizers, Biomass, Forest Products and Packaging, Commercial, Raw Materials, Waste Processing and Treatment, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Lebanon
- Rehabilitation of Metn water supply systems- Prepare/ update detailed studies and tender documents
- Preparation of detailed engineering design for Majdlaya and El Fouar villages drinking water project
- Preparation of Tender Documents for the Construction of the Works in Eastern Zahle Area and Western Bekaa and Rachaya Areas
- Master plan study for the treatment and disposal of sludge residues from wastewater treatment plants
- Cleaning of waste water and rain water networks in Beirut Southern suberbs: Technical Assistance and supervision
- Tebbaneh storm water networks-Supervision
- Preparation of a Feasibility Study for East Zahle Region Wastewater Project
- Feasibility study of West Bekaa water supply systems - Bekaa Water Supply Rehabilitation and Modernization project
