logo
ProjectClosed

Lake Road Forcemain Replacement

One of 10,000+ projects Taiyo tracks in Ohio.

Source: Dodge

The work covered by the plans and specifications includes: Installation of 275 LF of 8 force main and 15 steel casing pipe, 8 Fittings, 8 Air Release Valve, Seeding/Mulches and Site Restoration.

Status
Closed
Sector
Water Supply and Storage, Steel, Road, Government, Commercial, Metal
Location
Painesville Township, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Lake Road Forcemain Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lake Road Forcemain Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Painesville Township, Ohio, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work covered by the plans and specifications includes: Installation of 275 LF of 8 force main and 15 steel casing pipe, 8 Fittings, 8 Air Release Valve, Seeding/Mulches and Site Restoration.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Painesville Township

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Road, Government, Commercial, Metal

Article published date

2025-07-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project