Lake Saint Louis Transmission Main Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Contractor will be required to construct 9,495 linear feet of 16 ductile iron pipe and 1,230 linear feet of 20 HDPE pipe water transmission main. The project contains a connection to an existing 16 main near the intersection of Verterans Memorial Parkway and Freymuth Road thence east terminating at a point in front of the Lake Saint Louis (St. Joseph West) Hospital. The design includes careful
- Status
- Closed
- Sector
- Hotel, Power Transmission, Metal, Road, Government, Hospital, Water Supply and Storage, Waste Processing and Treatment, Steel, Power Generation (CCGT), Commercial
- Location
- O'Fallon, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lake Saint Louis Transmission Main Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contractor will be required to construct 9,495 linear feet of 16 ductile iron pipe and 1,230 linear feet of 20 HDPE pipe water transmission main. The project contains a connection to an existing 16 main near the intersection of Verterans Memorial Parkway and Freymuth Road thence east terminating at a point in front of the Lake Saint Louis (St. Joseph West) Hospital. The design includes careful planning to avoid existing utilities and coordinating with utility providers to aid in minimizin... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | O'Fallon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hotel, Power Transmission, Metal, Road, Government, Hospital, Water Supply and Storage, Waste Processing and Treatment, Steel, Power Generation (CCGT), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hotel projects in United States of America
- 90 ROOM RESIDENCE INN HOTEL AND 144 TOWNHOMES TTM 8345, ZC & CUP
- ZONING TEXT AMENDMENT AND LAND USE REGULATIONS RELATED TO MEDICAL AND RECREATIONAL CANNABIS
- USE PERMIT TO OPEN A NURSING EDUCATIONAL CENTER
- MEDICAL WASTE PROCESSING/TREATMENT FACILITY
- MODIFICATION OF AUP-PL-2014-0065 TO ALLOW A HOTEL AND VAR FOR REDUCTION OF FRONT AND REAR YARD SETBACK FROM 10' TO 5'
- Wayfinding Planning
- Maryland Transportation Authority I-95 Travel Plazas
- Inova Women's Hospital & Children's Hospital
