Lake Sarez Risk Mitigation Project
Sector: Aerospace & Defense • Location: Tajikistan
Source: World Bank Group
The Lake Sarez Risk Mitigation Project aims to help alert and prepare vulnerable people in case of a disaster associated with an outburst flood from Lake Sarez and other frequent natural hazards such as mudslides, rockfalls, avalanches, and seasonal floods. The project consists of four components. 1) The first component will design and install a monitoring system and an early warning system to saf
- Status
- Closed
- Sector
- Aerospace & Defense, Government
- Location
- Tajikistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Lake Sarez Risk Mitigation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Lake Sarez Risk Mitigation Project aims to help alert and prepare vulnerable people in case of a disaster associated with an outburst flood from Lake Sarez and other frequent natural hazards such as mudslides, rockfalls, avalanches, and seasonal floods. The project consists of four components. 1) The first component will design and install a monitoring system and an early warning system to safeguard the life of the communities located in the Murgab and Bartang valleys and to define a long-term strategy for Lake Sarez. 2) The second component will make the early warning system community-based and help communities prepare for a potential outburst flood form Lake Sarez as well as for small-scale natural disasters that occur frequently in the mountains by providing social training and safety-related supplies. 3) The third component will finance consultancy services to conduct studies of long-term solutions. 4) Institutional strengthening component will finance consultancy and equipment to strengthen the capabilities of the Sarez Agency and other units within the Ministry of Emergency Situations and Civil Defense, as well as the incremental operating costs associated with project management. |
Original sector | FY17 - Public Administration |
Budget |
Location
Country | Tajikistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
