Lake Source Cooling LSC Cleaning 2024
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Project Description 1. Recover, clean, and inspect the Lake Source Cooling intake screen. 2. Clean the 10,230 foot long, 63 diameter, Lake Source Cooling intake line using pipeline pigs propelled via existing pumps requires removing and replacing flanges and installing temporary grate on outfall line. 3. Restore intake screen. Restore outfall and plant to normal operating lineup by removing and re
- Status
- Closed
- Sector
- Education, Commercial
- Location
- Ithaca, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lake Source Cooling LSC Cleaning 2024
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Description 1. Recover, clean, and inspect the Lake Source Cooling intake screen. 2. Clean the 10,230 foot long, 63 diameter, Lake Source Cooling intake line using pipeline pigs propelled via existing pumps requires removing and replacing flanges and installing temporary grate on outfall line. 3. Restore intake screen. Restore outfall and plant to normal operating lineup by removing and replacing flanges |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Ithaca |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Education, Commercial |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
